Posted: May 04, 2024

Maximising Operational Efficiency: Proactive Solutions for a Global Insurance Giant

Industry:BFSI

SHARE

Meet the Client

Our client, a leading US-based insurance giant with over 153 years of experience, is a prominent insurer in the global market. With a presence in over 40 markets and serving 96 of the top 100 FORTUNE 500® companies, they specialise in health, life, accident insurance, retirement planning, and savings solutions. Their reputation as a worldwide leader in innovation and protection planning is unmatched. 

Business Problems

  • Resource Allocation: Inefficient resource distribution led to increased storage consumption 
     
  • Remote & Hybrid Coordination: Multiple storage and connectivity issues hindered individual contributions during remote and hybrid work scenarios 
     
  • Utilisation: Legacy technology underperformed, resulting in disrupted hardware utilisation
     
  • Wastage: Distribution issues caused storage mismanagement and wastage of resources

Challenges 

The US-based insurance giant faced a primary challenge related to poor resource distribution affecting backend processes and storage management. This resource allocation challenge weakened the existing infrastructure, leading to improper resource distribution across different departments and teams. This US-based insurance giant with its legacy technology was unable to keep up with modern workload demands. Its underperformance resulted in underutilized hardware resources and inefficient processing power. 

There were multiple remote & hybrid coordination challenges due to connectivity issues. These ranged from network latency to compatibility issues with remote access tools, impacting productivity and collaboration. Also, limited individual contributions resulted in connectivity and accessibility challenges, limiting individual contributions from employees working remotely or in hybrid setups. It affected project timelines and overall efficiency. 

Inadequate storage management practices resulted in misallocation of storage resources. This led to data fragmentation, increased backup and recovery times, and challenges in data lifecycle management. This not only increased costs but also hindered scalability and agility.   

Solution

  • Proactive provided a comprehensive solution for transition to a 3-tier architecture in a Hyper-Converged Infrastructure (HCI) using Dell VxRail with VMware Hypervisor
     
  • Deployed Citrix VDI with 20% dedicated and 80% shared infrastructure, optimising resource utilization and enhancing user experience
     
  • Increased ROI, facilitated hybrid model integration, centralised employee data, ensured data security, and improved resource utilisation, resulting in reduced Total Cost of Ownership (TCO)   

Proactive’s tech team thoroughly studied the challenges faced by the client. Addressing these challenges required a holistic approach that encompassed infrastructure modernisation, virtualisation, and improved resource management practices. The implementation of the 3-tier architecture consolidation into Hyper-Converged Infrastructure (HCI) and Citrix VDI solutions played a pivotal role in overcoming these hurdles and driving significant improvements in operational efficiency and user experience. 

Results 

The transformation from a 3-tier architecture to hyperconverged infrastructure, coupled with Citrix VDI implementation, has significantly enhanced operational efficiency, resource utilisation, and user experience for the leading insurance giant.  

This adoption of modern technology solutions for a pilot project for 100 systems in Noida & Jaipur locations, yielded positive outcomes. It addressed complex business challenges and drove sustainable growth. It further reduced annual costing with optimised resource allocation and lowered wastage.  

This change improved the user experience and accessibility garnered positive feedback from users. Developers could efficiently utilise resources during remote work, contributing effectively to projects with an enhanced remote work capability. The centralised data storage and better resource distribution reduced storage mismanagement. 

What’s Next 

Due to the success of the pilot project, the client plans to scale up the solution: 

  • Expansion to 5000+ Systems: Deployment of Citrix VDI and Dell VxRail for enhanced performance and storage across all systems
     
  • Legacy Tech Replacement: Continued transition from legacy technology to modern, efficient solutions
     
  • Further Cost Optimisation: Continual focus on optimizing costs while improving operational efficiency 

More Case Studies

How Webex Cloud Calling Transformed Lohia Corp's Collaborative Environment
Read More
How Proactive Enabled Axtria to Streamline Network Operations with Cisco Meraki
Read More
Fuelling Growth: A Digital Transformation Story in the Indian Energy Sector
Read More
Proactive Powers Smart Classes with Seamless Connectivity
Read More